Davy's RV-14A Build
Home
(11776.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Deburred, prepped and primed wheel fairing brackets. Attached nutplates. Installed brake fittings
15 Aug 2022
1.5 hours
Section 43
Cut and clecoed baffles. Installed blast cooling tubes
11 Aug 2022
1.5 hours
Section 47
Riveted baffle seals
11 Aug 2022
1.5 hours
Section 47
Completed airbox install and alternate air door
10 Aug 2022
8 hours
Section 47
Dimple and prime wing skins. Rivet flap and aileron gap fairings Toto left and right wings. Cleco on left wing skin. Run power wire for pitot heat.
10 Aug 2022
6.5 hours
Section 20
Install pitot tube mast. Drill holes into mast for pitot tube. Reroute two wires in left wing. Install two flap hinge bearings.
9 Aug 2022
4.5 hours
Section 20
Trimmed snorkel to air box. Bonded air box and snorkel. Modified oil return line.
9 Aug 2022
2 hours
Section 47
Fabricated wing box J channel-longs for left and right wing. Checked torque on all fuel tank attach bolts.
8 Aug 2022
4.5 hours
Section 20
Installed fuel servo. Installed sniffle valve. Installed fuel and mixture cables.
5 Aug 2022
3 hours
Section 50
Ran fuel lines, Starter wire and Alternator wire. Installed dipstick. Installed ground strap
4 Aug 2022
3 hours
Section 47