Davy's RV-14A Build
Home
(1308.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Torqued and safety wired prop bolts. Tensioned alternator belt and safety wired.
5 Sep 2022
2.5 hours
Section 47
Riveted doubler to spinner backplate. Mounted back plate to prop. Mounted prop to engine
1 Sep 2022
2.5 hours
Section 47
Cut and clecoed baffles. Installed blast cooling tubes
11 Aug 2022
1.5 hours
Section 47
Riveted baffle seals
11 Aug 2022
1.5 hours
Section 47
Completed airbox install and alternate air door
10 Aug 2022
8 hours
Section 47
Trimmed snorkel to air box. Bonded air box and snorkel. Modified oil return line.
9 Aug 2022
2 hours
Section 47
Ran fuel lines, Starter wire and Alternator wire. Installed dipstick. Installed ground strap
4 Aug 2022
3 hours
Section 47
Installed oil and fuel pressure lines. Fabricated mounting bracket and install fuel flow sender.
3 Aug 2022
1.5 hours
Section 47
Installed baffle ties
2 Aug 2022
1 hours
Section 47
Finished mounting baffles. Installed prop governor
1 Aug 2022
6 hours
Section 47