Davy's RV-14A Build
Home
(1308.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Wires both snags and tested power. Ran manifold pressure tubes. Ran all FWF wires to Garmin. Wired starter switch.
22 Sep 2022
7.5 hours
FWF
Completed spark plug wire runs to cylinders 1&3. Finished wires for CHT and EGT on cylinders 2&4. Ran wires for Oil pressure, manifold pressure, fuel pressure, fuel flow, and oil temp.
21 Sep 2022
7 hours
FWF
Finished spark plug wires on cylinders 2&4. Connected alternator wires. Connected CHT and EGT wires to 2&4.
19 Sep 2022
3.5 hours
FWF
Twisted eight wires for CHT and EGT sensors. Installed wires on cylinder 1 and 3 and rand wires to Garmin GEA. Dressed wires in right side of engine.
15 Sep 2022
5 hours
FWF
Installed spark plug wires, manifold pressure tube, and ignition ground wires.
14 Sep 2022
4.5 hours
FWF
� 2020