Davy's RV-14A Build
Home
(1308.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Trimmed, drilled and installed horizontal stabilizer fairings
3 Oct 2022
4 hours
Section 28
Finished bottom rudder fairing. Installed and wired tail light. Installed vertical stabilizer fairing
22 Sep 2022
5 hours
Section 28
Finished installing wing tip ribs and nav lights. Epoxy primed steps. Realigned wing tip trailing edge
19 Sep 2022
5.5 hours
Section 28
Finished installing nut plates and trimming wing tips, installed nav light
15 Sep 2022
6 hours
Section 28
Drilled, countersunk and attached nut plates to wing tips. Finished wing tip lenses
13 Sep 2022
5.5 hours
Section 28
Worked on firewall modification for exp-119. Battery box. Forward seat cover ribs.
10 Aug 2021
7.5 hours
Section 28
Continued work on forward fuselage and firewall
9 Aug 2021
8.5 hours
Section 28
Worked on forward skins and exhaust tunnel
6 Aug 2021
6 hours
Section 28
Prepped and primed parts for forward bottom skins and exhaust tunnel
3 Aug 2021
5 hours
Section 28