Davy's RV-14A Build
Home
(6542.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Completed spark plug wire runs to cylinders 1&3. Finished wires for CHT and EGT on cylinders 2&4. Ran wires for Oil pressure, manifold pressure, fuel pressure, fuel flow, and oil temp.
21 Sep 2022
7 hours
FWF
Installed steps. Installed elevator fairings. Started rudder fairings
20 Sep 2022
7 hours
Section 42
Finished installing wing tip ribs and nav lights. Epoxy primed steps. Realigned wing tip trailing edge
19 Sep 2022
5.5 hours
Section 28
Finished spark plug wires on cylinders 2&4. Connected alternator wires. Connected CHT and EGT wires to 2&4.
19 Sep 2022
3.5 hours
FWF
Finished installing nut plates and trimming wing tips, installed nav light
15 Sep 2022
6 hours
Section 28
Twisted eight wires for CHT and EGT sensors. Installed wires on cylinder 1 and 3 and rand wires to Garmin GEA. Dressed wires in right side of engine.
15 Sep 2022
5 hours
FWF
Installed spark plug wires, manifold pressure tube, and ignition ground wires.
14 Sep 2022
4.5 hours
FWF
Drilled, countersunk and attached nut plates to wing tips. Finished wing tip lenses
13 Sep 2022
5.5 hours
Section 28
Finished canbus for left wing. Install cylinder temp and exhaust temp probes. Readied for FFW wiring.
13 Sep 2022
3.5 hours
Section 56
Finished spinner, trimmed, sanded and fitted wing tips. Trimmed and drilled wing tip lens
12 Sep 2022
6.5 hours
Section 24
� 2020
Design
pdevty