Davy's RV-14A Build
Home
(3925.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Cut panel labels.
12 Oct 2022
2 hours
Avionics
Fabricate and install left and right swing to fuselage fuel line. Connect and adjust ailerons. Connect pitot and AOA lines.
12 Oct 2022
7 hours
Section 41
Installed wing tips and tested strobe and position lights. Installed labels on instrument panel.
12 Oct 2022
7 hours
Avionics
Hooked up flaps, installed nut plates for wing root gap fairings
11 Oct 2022
3.5 hours
Section 41
Installed wings
10 Oct 2022
2 hours
Section 41
Riveted on wing root fairing stiffeners, helped install wings, trimmed spacers, filled vertical stabilizer tip fairing
10 Oct 2022
5 hours
Section 41
Assembled and installed aileron push rods. Fabricated left and right fuel tank vent lines.
6 Oct 2022
4.5 hours
Section 41
Drilled and riveted nut plates for empennage fairing. Cut, drilled, deburred, primed and dimpled dimpled wing root fairings
6 Oct 2022
6.5 hours
Section 41
Installed panel lights and defogger fans. Wired lights, fans, and canopy closed switch. Tested for proper operation.
5 Oct 2022
5 hours
Avionics
Filled in and sanded horizontal and vertical stabilizer fairings. Trimmed and drilled empennage fairing
4 Oct 2022
5.5 hours
Section 12
� 2020
Design
pdevty