Davy's RV-14A Build
Home
(32712.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Riveted mid bulkhead parts. Reamed mid bulkhead parts
24 Jun 2021
6.5 hours
Section 25
Preped and primed fwd mid fuse bulkheads. Began work on mid fuselage brace bulkhead
23 Jun 2021
5 hours
Section 25
Inventoried fuselage hardware
21 Jun 2021
2 hours
Other
Drilled horizontal stab to tailcone
8 Jun 2021
2.5 hours
Section 11
Installed rod-end bearing in elevators. Match drilled elevators to horizontal stablizer.
7 Jun 2021
4 hours
Section 11
Finished riveting tailcone.
4 Jun 2021
4 hours
Section 10
Finished riveting aft deck. Drilled VS to tailcone. Riveted top skin rib. Clecoed upper side skins on.
3 Jun 2021
3 hours
Section 10
Ran ELT cable. Rivet aft deck. Match drilled aft deck parts to each other.
31 May 2021
3 hours
Section 10
Rudder cable install. Static line install. Aft nutplates. Tops skins dimpled
28 May 2021
6.5 hours
Section 10
Finished riveting rear aft and bottom aft fuselage skins
27 May 2021
2.5 hours
Section 10