Davy's RV-14A Build
Home
(26170 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Prepare and rivet L&R canopy decks. Rivet wiring channel and cable support brackets. Start work on instrument panel frame. Rivet nut plates to panel frame. Cleco panel frame to attach brackets.
9 Nov 2021
6 hours
Section 35
Riveted forward assembly to firewall. Riveted wire channel to forward assembly. Cleco on rear deck.
4 Nov 2021
3 hours
Section 35
Primed upper forward fuselage parts. Assembled and riveted all parts. Upper forward assembly clecoed to fuselage.
3 Nov 2021
7.5 hours
Section 35
Prepared all upper forward fuselage parts from priming including dimpling and countersinking
2 Nov 2021
6.5 hours
Section 36
Finished rudder assembly installation. Started next section parts preparation.
26 Oct 2021
5.5 hours
Section 33
Started rudder pedal assembly. Test fitted assemblies and all bolts. Test fitted master cylinders and installed fittings. Painted brake pedals. Drilled bearing blocks. Cut brake lines to length.
25 Oct 2021
6 hours
Section 33
Fixed backwards rudder cables. Drilled flap tubes. Installed flap tubes and motor. Tested flap system.
6 Oct 2021
7 hours
Section 33
Built brakes, bolt brake reservoir to firewall
5 Oct 2021
4 hours
Section 33
Finished riveting baggage area. Prepped and painted interior.
30 Sep 2021
7 hours
Section 32
Finished baggage floor, riveted baggage floor splice, riveted flap motor channel and brackets
29 Sep 2021
8 hours
Section 31
� 2020