Davy's RV-14A Build
Home
(24861.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Worked on elevator pushrods
8 Dec 2021
3.5 hours
Section 36
Worked on elevator pushrods
7 Dec 2021
4 hours
Section 36
Drilled roll bar to fuselage. Dan wire harness
6 Dec 2021
6.5 hours
Section 37
Match drilled, countersunk and riveted roll bar. Drilled and installed ground block
5 Dec 2021
4.5 hours
Section 37
Masked and painted interior parts
29 Nov 2021
2.5 hours
Section 36
Prepare and prime all roll bar parts. River brace brackets to brace. Rivet forward and rear roll bar frames together. Cleco roll bar assembly together prepare for final drilling. Proseal firewall to forward upper skin and proseal junction of 01455C and forward upper skin.
23 Nov 2021
7.5 hours
Section 37
Assembled canopy cradle assembly and bolted assembly to upper forward fuselage. Tested for proper operation. Riveted forward top skin.
18 Nov 2021
7 hours
Section 35
Prepare for and rivet top skin. Prime canopy angles
16 Nov 2021
4 hours
Section 35
Worked on canopy release mechanism, firewall hinges, dimple top skin.
11 Nov 2021
5.5 hours
Section 35
Rivet instrument panel frame assembly to instrument panel attach. Bolted gas springs to rib. Started release mechanism.
10 Nov 2021
2 hours
Section 35
� 2020
Design
pdevty