Davy's RV-14A Build
Home
(18319 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Continued work on canopy frame
10 May 2022
5.5 hours
Section 38
Finished installing canopy latch. Started assembly and drilling of canopy frame
10 May 2022
7 hours
Section 38
Inventory, installed canopy latch and bar. Machined the latch pins to fit.
4 May 2022
4 hours
Section 38
Finished rear window installation. Started on latch.
3 May 2022
5 hours
Section 38
Scuffed, cleaned and primed parts. Trimmed, drilled, tapped and countersunk window
28 Apr 2022
6.5 hours
Section 38
Cut and deburred canopy parts
27 Apr 2022
3.5 hours
Section 38
Pulled and prepared parts for priming
26 Apr 2022
2.5 hours
Section 38
Move and unpack heli
20 Apr 2022
2 hours
Other
Unpacked RotorX crates. Disposed of crates
20 Apr 2022
4 hours
Other
Installed alternator field wire to master switch. Ran positive and ground wire to starter switch. Installed ELT batteries and tested
19 Apr 2022
5 hours
Avionics
� 2020
Design
pdevty