Davy's RV-14A Build
Home
(13085 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
ADHRS harness
3 Aug 2022
0.5 hours
Section 17
Install pitot and AOA lines in lift wing. Drill, debur, and dimple flap and aileron gap fairings for left and right wings. Dimple wing skins.
3 Aug 2022
5 hours
Section 20
Installed oil and fuel pressure lines. Fabricated mounting bracket and install fuel flow sender.
3 Aug 2022
1.5 hours
Section 47
Finished installing seatbelts, installed nutplates and access panel, installed wing wiring
2 Aug 2022
5 hours
Section 17
Finished priming parts. Installed tank drains. Installed wiring in left and right wings.
2 Aug 2022
4.5 hours
Section 19
Installed baffle ties
2 Aug 2022
1 hours
Section 47
Deburred, prepped and primed parts. Installed nutplates and assembled flap motor cover. Installed seat belts
1 Aug 2022
6 hours
Section 42
Finished mounting baffles. Installed prop governor
1 Aug 2022
6 hours
Section 47
Scuff and prime a few spots that showed light corrosion. Found, prepped, and primmed access cover, lens brackets, and landing light housing. Started nut plants installation.
1 Aug 2022
4.5 hours
Section 17
Prepped and primed parts
26 Jul 2022
1.5 hours
Section 42
� 2020
Design
pdevty