Davy's RV-14A Build
Home
(5234 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Installed G5. Ran power wires for G5, GAD29 and GEA24.
21 Feb 2022
2 hours
Avionics
Ran powers wires for GAD27. Routes Canbus wire from harness to instrument panel
18 Feb 2022
1.5 hours
Avionics
Fabricated mounting plate for audio panel. Crimped and installed main power wire to fuse bus.
17 Feb 2022
2.5 hours
Avionics
Cut center instrument panel. Positioned and drilled center avionics trays
15 Feb 2022
2.5 hours
Avionics
Cut pilot side instrument panel. Installed instrument panel in plane
14 Feb 2022
3.5 hours
Avionics
Cut passenger side panel. Mounted fuse block. Installed panel in plane.
13 Feb 2022
3.5 hours
Avionics
Completed panel modeling. Created panel cutting templates
10 Feb 2022
2.5 hours
Avionics
Drilled wiring holes in subpanel
9 Feb 2022
1 hours
Avionics
Fabricated spacers for GAD29 mounting. Drilled and mount backup battery and LRUs
9 Feb 2022
3.5 hours
Avionics
Fabricate copper strap, install and connect alternator fuse. Fabricate and install
5 Jan 2022
2 hours
Avionics