Davy's RV-14A Build
Home
(3925.5 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Installed GPS antenna. Fabricated GPS antenna wire and installed. Tested GTX 375 for GPS signal. Wired fuel pump and tested. Installed ELT antenna.
31 Mar 2022
6.5 hours
Avionics
Ran static tube and ELT wire from aft to under instrument panel. Cleaned-up wiring (used wire ties) behind sub-panel. Started work on GPS antenna installation.
29 Mar 2022
5 hours
Avionics
Replaced broken flap switch in stick grip. Wired and assembled To/Ga button and dimmer. Tested all wiring from last week.
28 Mar 2022
4.5 hours
Avionics
Completed wiring from GNX 375 to GAD 29, Pilot GDU, and GSU. Installed com and transponder antennas. Fabricated and ran Com and transponder antenna wires. Wired transmit interlock on GTR 200s. Tested wiring and configured radios.
24 Mar 2022
8 hours
Avionics
Wired GMC 375 to Co-Pilot GDU. Wired TO/GA from GMC and GNX. Fabricated wires for GNX 375 to GSU25, GAD29, and Pilot GDU.
23 Mar 2022
6.5 hours
Avionics
Competed backshells for both GTR 200s, GMA 245R, and co-pilot GMU.
22 Mar 2022
6.5 hours
Avionics
Finished wiring radios, GDU, and GNX to GMA 245R. Tested work to date.
18 Mar 2022
7 hours
Avionics
Tested and completed Canbus. Wired headset plugs to GMA245z
16 Mar 2022
6.5 hours
Avionics
Completed Canbus and tested. Updated all LRU software.
15 Mar 2022
6 hours
Avionics
Completed Canbus wiring.
14 Mar 2022
6 hours
Avionics
� 2020