Davy's RV-14A Build
Home
(2617 Total Hrs)
Avionics
(189 Hrs)
Fuselage
(3.5 Hrs)
Fwf
(27.5 Hrs)
None
(3.5 Hrs)
Other
(59 Hrs)
Section 10
(60.5 Hrs)
Section 11
(13 Hrs)
Section 12
(5.5 Hrs)
Section 17
(10 Hrs)
Section 18
(13 Hrs)
Section 19
(4.5 Hrs)
Section 20
(46.5 Hrs)
Section 22
(16.5 Hrs)
Section 23
(12 Hrs)
Section 24
(6.5 Hrs)
Section 25
(18.5 Hrs)
Section 26
(47.5 Hrs)
Section 27
(19 Hrs)
Section 28
(53 Hrs)
Section 29
(65.5 Hrs)
Section 30
(21 Hrs)
Section 31
(19.5 Hrs)
Section 32
(12 Hrs)
Section 33
(22.5 Hrs)
Section 35
(35 Hrs)
Section 36
(28.5 Hrs)
Section 37
(21 Hrs)
Section 38
(90 Hrs)
Section 39
(7 Hrs)
Section 40
(14 Hrs)
Section 41
(34.5 Hrs)
Section 42
(20.5 Hrs)
Section 43
(21.5 Hrs)
Section 44
(12 Hrs)
Section 45
(32.5 Hrs)
Section 46
(29 Hrs)
Section 47
(39 Hrs)
Section 48
(11 Hrs)
Section 49
(7 Hrs)
Section 50
(15 Hrs)
Section 55
(6.5 Hrs)
Section 56
(20.5 Hrs)
Section 6
(10 Hrs)
Section 7
(19.5 Hrs)
Section 8
(31 Hrs)
Section 9
(54.5 Hrs)
Finished ELT install. Installed pitot line to ADAHARS. Bled brake lines and tested brakes. Installed rudder faring and tested strobe.
30 Sep 2022
6 hours
Avionics
Finished touring wires. Installed screens. Configured engine sensors. Worked on ELT configuration.
29 Sep 2022
6.5 hours
Avionics
Finished wiring all engine sensors to Garmin GEA24
27 Sep 2022
5.5 hours
Avionics
Installed alternator field wire to master switch. Ran positive and ground wire to starter switch. Installed ELT batteries and tested
19 Apr 2022
5 hours
Avionics
Installed all back shells, wired Ignition 1&2 power, wired pitch and trim servo sense.
15 Apr 2022
5 hours
Avionics
Wired strobes, navigation lights, pitot heat, defrost fan, left and right fuel, and OAT sensor
14 Apr 2022
7 hours
Avionics
Finished wiring trim. Wired glare shield LED and Landing lights.
13 Apr 2022
6 hours
Avionics
Finished flaps wiring. Wired stick grips to flaps, trim, and autopilot disconnect. Changed GNX-375 power to fail safe. Tested all work.
7 Apr 2022
6 hours
Avionics
Competed ELT installation. Continued flaps configuration.
6 Apr 2022
5 hours
Avionics
Strated installation of ELT. Began flaps wiring.
4 Apr 2022
5 hours
Avionics